Saturday 17 December 2011

Day 90


What have I been doing? Well, nothing very exciting. We finally ordered the timber, after deciding to go with design A, the one with the A-frame detail.


Who would have thought it would be so difficult to get hold of some bits of wood! It should be here before Christmas, so then I can really get on with something. In the mean time I’ve been designing the rafters to go round the curved ends of the roof and generally faffing around on the computer, planning and designing!


I’ve also cut out the ply wood for the base plate, that’s the bit the bales will sit on.