Tuesday 20 March 2012

20th March


It’s been a challenge from the start to get the design finished. The last couple of weeks my sidekick (Robin) and I, along with Alan (the professional builder), have been completing the important details of the design. Such as, the poach construction, window placement, Rafter details, ground floor plan and the mezzanine details. So, I’ve been doing a bit of model making and boring computer work.  In the mean time we’ve finished the timber frame and started putting bales in, using a bale needle and twine to adjust bale sizes and a hedge trimmer for shaping.