Thursday, 25 October 2012

I've finished!... the outside...almost.

Started work on the floor. Thats recycled foam glass for the insluation layer, not coal, if you were wondering.
 
 
Mixing shelter
 
 
2nd coat of lime
 
 
 
 
Smooth, top coat of lime
 
 
All done
 

Friday, 5 October 2012

Hello autumn


Roof light windows, planed, lead flashing, watertight
 
 
 
Shingles, tapers cut and nailed

                            

Cut a hole in the roof, installed flue.

 
 
 
 
 

Cover finaly off, no leaks in the roof.
 
 
 
 
 
 
 
 

Lime plaster outside walls, coat number one, scratch coat.
 
 
 
 
>

Saturday, 28 July 2012

Finally finished the batters and now started putting the shingles on.








Thursday, 26 April 2012

Rafters

 Im working on the rafters at the moment, I just ordered 680 meters of batten and 4600 Cedar shingles,that should keep be busy for a while!






Tuesday, 20 March 2012

20th March


It’s been a challenge from the start to get the design finished. The last couple of weeks my sidekick (Robin) and I, along with Alan (the professional builder), have been completing the important details of the design. Such as, the poach construction, window placement, Rafter details, ground floor plan and the mezzanine details. So, I’ve been doing a bit of model making and boring computer work.  In the mean time we’ve finished the timber frame and started putting bales in, using a bale needle and twine to adjust bale sizes and a hedge trimmer for shaping.